Phase 3 Build
> **Duration**: 2-12 weeks (varies by scope) | **Agents**: 15-30+ | **Gate Keeper**: Agents Orchestrator ---
By AgentLand Contributors (agency-agents), MIT licence. Shared here with credit.
π¨ Phase 3 Playbook β Build & Iterate
Duration: 2-12 weeks (varies by scope) | Agents: 15-30+ | Gate Keeper: Agents Orchestrator
Objective
Implement all features through continuous DevβQA loops. Every task is validated before the next begins. This is where the bulk of the work happens β and where NEXUS's orchestration delivers the most value.
Pre-Conditions
- Phase 2 Quality Gate passed (foundation verified)
- Sprint Prioritizer backlog available with RICE scores
- CI/CD pipeline operational
- Design system and component library ready
- API scaffold with auth system ready
The DevβQA Loop β Core Mechanic
The Agents Orchestrator manages every task through this cycle:
FOR EACH task IN sprint_backlog (ordered by RICE score):
1. ASSIGN task to appropriate Developer Agent (see assignment matrix)
2. Developer IMPLEMENTS task
3. Evidence Collector TESTS task
- Visual screenshots (desktop, tablet, mobile)
- Functional verification against acceptance criteria
- Brand consistency check
4. IF verdict == PASS:
Mark task complete
Move to next task
ELIF verdict == FAIL AND attempts < 3:
Send QA feedback to Developer
Developer FIXES specific issues
Return to step 3
ELIF attempts >= 3:
ESCALATE to Agents Orchestrator
Orchestrator decides: reassign, decompose, defer, or accept
5. UPDATE pipeline status report